This is why it’s important to operate with enough available reserves (fast and slow) to cover the unexpected loss of your biggest generator, transformer, and/or transmission line.
Their black start procedures are going to be getting a good workout; I hope they’re well tested.
This is why it’s important to operate with enough available reserves (fast and slow) to cover the unexpected loss of your biggest generator, transformer, and/or transmission line.
Their black start procedures are going to be getting a good workout; I hope they’re well tested.